Planning a Custom Inground Pool: Why One Company Doing the Whole Job Matters
A pool is a construction project, not a product. How the trades are coordinated decides how smooth it goes.
October 17, 2026 · 4 min read

When people picture a new pool, they picture the finished backyard: the water, the stone, the lights at dusk. What they don't picture is the order of work that gets there. An inground pool involves digging and hauling away soil, building the pool itself, carpentry, a gas line for a heater, electrical for the pump and lights, plumbing, and landscaping around all of it. Each of those is a separate trade. How they're coordinated is where a pool project goes well or badly.
The problem with a project run by five different companies
If you hire trades separately, you become the project manager. The excavator needs to finish before construction starts. The plumber needs the pool in place. The electrician has to be there before the landscaping closes things up. Every handoff is a place for delay, and when something goes wrong, each company can point at another. The delays cost you a swimming season, which in Ontario is short enough that a few weeks matters.
How Ace Pools is set up
Ace Pools manages excavation and haulage, construction, landscaping, carpentry, gas, electrical and plumbing with its own dedicated teams. Each division focuses on a single specialty. The idea is simple: people who do one thing all day get good at it, and because they all work under the same roof, the handoffs between them don't depend on you making phone calls.
That structure is why we say fewer delays. We aren't claiming that nothing ever goes wrong, because weather and ground conditions can surprise anyone. We're saying that when the next trade is part of the same company, the schedule is something we manage, not something we wait on.
One of our customers, Georges Carlier, described the benefit in his review: Ace was able to complete the entire project through Ace Landscaping and Ace Contracting, including landscaping, a new deck and a fence, and the work was completed on time and on budget.
What happens before the dig
A good project starts with design and planning, not a shovel. We help with the building permit process and plan the job through to landscape lighting. We're not going to quote permit specifics here, because requirements vary by municipality and property, and that's a conversation to have about your lot. What's worth knowing is that someone handling the permit side for you is one less thing between you and a start date.
What you can include
Part of designing a custom pool is deciding what surrounds it. Options we build include:
- Natural stone, for coping and surrounding surfaces.
- Water features and diving rocks.
- LED lights, including colour options.
- Cabanas, sheds and decks.
You don't need to decide everything on day one. But thinking about it early matters, because adding a cabana or a gas line later usually means digging up something that's already finished. It's cheaper to plan for it at the start, even if you install it in a later phase.
Questions to ask any pool builder
- Which parts of the project are done by their own crews, and which are subcontracted?
- Who is my single point of contact once construction starts?
- Who handles permit paperwork?
- What happens after the pool is built: who do I call in July when something needs attention?
The last question matters more than most people think. A pool is a long relationship, not a one-time purchase. Ace Pools supports owners after the build with maintenance, openings and closings, repairs, and a retail store stocked with water testing, chemicals, parts and accessories.
Pool School at handover
Handing over a new pool is more than handing over keys. A new owner has to learn how the equipment works, what to check, and what to do when something looks off. One customer, Sebastian S&C, wrote in a review: “The Pool School from Joe at the end was the perfect final touch!!” That walkthrough is part of how a project finishes, and it's something a first-time owner will use every week.
Where to start
If you're thinking about a pool for next season, the time to talk is now, not in spring. Planning, permits and scheduling all take time, and a project that begins in the cold months has a better chance of being finished when the weather turns. Have a look at our design and construction page to see the kinds of work we do, then get in touch through the contact page with your property and what you have in mind.
A pool should feel like a good decision for years after the dig. Choosing who builds it, and how well the trades work together, is most of that decision.
Ace Pools, 647 998 POOL (7665)
Call 647 998 POOL (7665)More articles
What Happens at a Pool Opening, Step by Step
Here's what the crew does while you're at work, and the three small things we ask of you.
Closing Your Pool for an Ontario Winter, and What We Do on the Day
A good closing is what makes next spring's opening easy, and it protects the parts of the pool that freezing water can break.